Details of Fees

 

 

 

 

 

(1) Registration Fee (Boiler)    
The fee required to accompany an application under sub-section (1) of section 7 of the Act, shall be;
Sr. No.   Rating Amount
(Rs.)
1 For  boiler rating not exceeding 10  600/-
2 For  boiler rating exceding 10 but not exceeding 30 800/-
3 For  boiler rating exceding 30 but not exceeding 50 900/-
4 For  boiler rating exceding 50 but not exceeding 70 1100/-
5 For  boiler rating exceding 70 but not exceeding 90 1300/-
6 For  boiler rating exceding 90 but not exceeding 110 1500/-
7 For  boiler rating exceding 110 but not exceeding 200 1700/-
8 For  boiler rating exceding 200 but not exceeding 400 1900/-
9 For  boiler rating exceding 400 but not exceeding 600 2200/-
10 For  boiler rating exceding 600 but not exceeding 800 2400/-
11 For  boiler rating exceding 800 but not exceeding 1000 2700/-
12 For  boiler rating exceding 1000 but not exceeding 1200 3200/-
13 For  boiler rating exceding 1200 but not exceeding 1400 3600/-
14 For  boiler rating exceding 1400 but not exceeding 1600 4200/-
15 For  boiler rating exceding 1600 but not exceeding 1800 4500/-
16 For  boiler rating exceding 1800 but not exceeding 2000 5000/-
17 For  boiler rating exceding 2000 but not exceeding 2200 5400/-
18 For  boiler rating exceding 2200 but not exceeding 2400 6000/-
19 For  boiler rating exceding 2400 but not exceeding 2600 6300/-
20 For  boiler rating exceding 2600 but not exceeding 2800 6800/-
21 For  boiler rating exceding 2800 but not exceeding 3000 7200/-
  Above 3000 for every 200 or part thereof an additional fee of Rs.200/- shall be charged.  

(2) Registration Fee (Economiser)  
An application for registration of Economiser shall be accompained by appropriate fee as specified below:
Sr. No.   Rating Amount
(Rs.)
1 For economiser rating not exceeding 50 500/-
2 For economiser rating exceeding 50 but not exceeding 100 600/-
3 For economiser rating exceeding 100 but not exceeding 150 700/-
4 For economiser rating exceeding  150  but not exceeding 200 800/-
5 For economiser rating exceeding 200  but not exceeding 250 900/-
6 For economiser rating exceeding 250  but not exceeding 300 950/-
7 For economiser rating exceeding 300  but not exceeding 350 1000/-
8 For economiser rating exceeding 350  but not exceeding 400 1100/-
9 For economiser rating exceeding 400  but not exceeding 450 1200/-
10 For economiser rating exceeding 450  but not exceeding  500 1300/-
11 For economiser rating exceeding 500 but not exceeding 600 1400/-
12 For economiser rating exceeding 600 but not exceeding 700 1500/-
13 For economiser rating exceeding 700 but not exceeding 800 1600/-
14 For economiser rating exceeding 800 but not exceeding 900 1700/-
15 For economiser rating exceeding 900 but not exceeding 1000 1800/-
  Above 1000 rating for every 200 or part thereof, an additional fees of Rs.100/- shall be charged.  

(3) Fees for Inspection (Boilers)  
Feess for Inspection for renewal of certificate of Boilers shall be calculated on the basis of rating and shall be levied in accordance with the following scale :
Sr. No.  Rating Amount
(Rs.)
1 Not exceeding 10 square metre 560/-
2 Exceeding 10 square metre but not exceeding 25 square metre 680/-
3 Exceeding 25 square metre but not exceeding 50 square metre 800/-
4 Exceeding 50 square metre but not exceeding 75 square metre 920/-
5 Exceeding 75 square metre but not exceeding 100 square metre 1040/-
6 Exceeding 100 square metre but not exceeding 150 square metre 1280/-
7 Exceeding 150 square metre but not exceeding 200 square metre 1900/-
8 Exceeding 200 square metre but not exceeding 400 square metre 2200/-
9 Exceeding 400 square metre but not exceeding 600 square metre 2500/-
10 Exceeding 600 square metre but not exceeding 800 square metre 2800/-
11 Exceeding 800 square metre but not exceeding 1000 square metre 3200/-
12 Exceeding 1000 square metre but not exceeding 1200 square metre 3600/-
13 Exceeding 1200 square metre but not exceeding 1400 square metre 4000/-
14 Exceeding 1400 square metre but not exceeding 1600 square metre 4500/-
15 Exceeding 1600 square metre but not exceeding 1800 square metre 6000/-
16 Exceeding 1800 square metre but not exceeding 2000 square metre 6600/-
17 Exceeding 2000 square metre but not exceeding 2200 square metre 7200/-
18 Exceeding 2200 square metre but not exceeding 2400 square metre 7800/-
19 Exceeding 2400 square metre but not exceeding 2600 square metre 8400/-
20 Exceeding 2600 square metre but not exceeding 2800 square metre 9000/-
21 Exceeding 2800 square metre but not exceeding 3000 square metre 9600/-
  Above 3000 sq. m. for every 200 sq. m. or part thereof an additional fee of Rs.240/- shall be charge. Fee for ordinary inspection of miniature boiler shall be Rs.120/-.  

(4)
Fees for Inspection (Economisers)
 
Feess for Inspection for renewal of certificate of Economisers shall be calculated on the basis of economisers rating and shall be levied in accordance with the following scale :
Sr. No.   Economiser Rating
Amount
(Rs.)
1 Not exceeding 50 square metre 400/-
2 Exceeding 50 square metre but not exceeding 100 square metre 500/-
3 Exceeding 100 square metre but not exceeding 150 square metre 600/-
4 Exceeding 150 square metre but not exceeding 200 square metre 700/-
5 Exceeding 200 square metre but not exceeding 250 square metre 800/-
6 Exceeding 250 square metre but not exceeding 300 square metre 1080/-
7 Exceeding 300 square metre but not exceeding 350 square metre 1200/-
8 Exceeding 350 square metre but not exceeding 400 square metre 1320/-
9 Exceeding 400 square metre but not exceeding 450 square metre 1440/-
10 Exceeding 450 square metre but not exceeding 500 square metre 1560/-
11 Exceeding 500 square metre but not exceeding 600 square metre 1680/-
12 Exceeding 600 square metre but not exceeding 700 square metre 1800/-
13 Exceeding 700 square metre but not exceeding 800 square metre 1920/-
14 Exceeding 800 square metre but not exceeding 900 square metre 2040/-
15 Exceeding 900 square metre but not exceeding 1000 square metre 2160/-
  Above 1000 sq. mt. For every 20 sq. m. or part thereof an additional fee of Rs.200/- shall be charged.  


(5) Fees for Inspection & Hydraulic Test of Steam / Feed Pipe Line  
Sr. No.   Description Amount      (Rs.)
1
For the pipes of nominal bore not exceeding100 mm inclusive of all fittings excepting like desuperheaters, steam-receiver,feed heaters and separately fired super-heaters for 30 metres of pipes or part thereof
200/-
2
For the pipes of nominal bore exceeding 100 mm inclusive of all fittings excepting like desuperheaters, steam-receiver,feed heaters and separately fired super-heaters for 30 metres or part thereof
500/-
3
Fees for inspection of fittings like feed water heaters, de-superheaters, steam receivers, separators  and separately fired superheaters for each such fittings.
500/-
  Inspection fees for :  
1 For inspection of tubes and pipes, the fees shall be charged at the rate of Rs. 150/- per metric tonne or a fraction thereof 150/-
2 For valves:  
  Subject to a minimum inspection fee of Rs.500/- per inspection for the vlaves, the inspection fee shall be charged as under 500/-
a Upto 25 mm per piece 5/-
b Above 25 mm and upto 100 mm per piece 20/-
c Above 100 mm and upto 250 mm per piece 150/-
d Above 250 mm per piece  400/-
4 For forged and cast flanges, the fees shall be charged as under:  
a Upto and including 25 mm for a batch of 50 or part thereof 120/-
b Upto and including 25 mm for a batch of 100 or part thereof  220/-
c Over 25 mm upto and 50 mm for a batch of 50 or part thereof 240/-
d Over 50 mm upto and including 100 mm for a batch of 25 or part thereof 240/-
e Over 100 mm upto and including 250 mm for a batch of 10 or part thereof  260/-
f Over 250 mm for a batch of 5 or part thereof  300/-
5 For plate flanges the fees shall be charged at half the rate as charged for forged and cast flanges.  
6 Fees for inspection of forged pipe fittings shall be charged at the rate  specified for forged and cast flanges.  
7 For pipe fittings other than forged pipe fittings the fees shall be charged as under:  
a Upto and including 50 mm, for 100 kg. Or a fraction therefore  50/-
b Over 50 mm and upto and including 100 mm for 450 kg. Or fraction thereof 250/-
c Over 100 mm for 900 kg. Or a fraction therefore 500/-
8(I)  fees for Inspection of spares and scantling:-For all types of coils, namely economiser coils, super-heaters coils, re-heaters coils, the fee for inspection shall be charged on the basis of surface area as provided in regulation no 385( Registration fees for boilers)  
8(ii)  scantling :-The fee for inspection of scantlings shall be charged as under  
a For outside surface area not exceeding 1 m2   500/-
b For outside surface area not exceeding 1 m2  but not exceeding 3 m2   600/-
c For outside surface area not exceeding 3 m2  but not exceeding 5 m2   700/-
d For outside surface area not exceeding 5m2  but not exceeding 7 m2  800/-
e For outside surface area not exceeding 7 m2  but not exceeding 9 m2   900/-
f For outside surface area not exceeding 9 m2  but not exceeding 11 m2   1000/-
  For outside surface area  exceeding 11 m2 a fee of Rs.50/- shall be charged for every 2  m2 or part thereof subject to a maximum of Rs.5000/-.  
9 Fees for the inspection of boiler at the site of construction shall be charged at the rate of four times the registration fees.  
10 Fees for exmination of  welder's under these regulations shall be Rs.100/- and this shall be born by the applicant / sponser.In addition, the applicant / sponser shall bear all other expenses like cost of material and workshop and testing facilities as fixed by the competent Authority  100/-

(6) DRAWING SCRUTINY FEES
1 For manfacturing drawings of boilers
  The fees for the scrutiny of the manufacutrng drawings and the particulars of the materials, design and construction of boilers under sub-regulations (a) or (b) of Regulation-393, shall be on the scale prescribed in regulation 385 (i.e. registration fees of boilers) subject to a maximum of Rs.20,000/- when the manufacturing drawings have been scrutinised and in respect of them alterations have been suggested and the same are resubmitted for scrutiny, separate fee at the rate of 10 % of the fee for the first scrutiny of the drawings shall be payable if the manufacturing drawings contain alterations other then those previously suggested.
2 For plans and particulars of materials, design and construction of steam pipes shall be at the rate of Rs.30/- for 30 meters of piping or part thereof
3 For Heat Exchangers, Pressure Vessels etc. shall be charged as per scale prescribed in regulation 385 (i.e. registration fees of boiler).
4 For fitting like de-superheaters, steam receivers, separators and flanges shall be Rs.150/- for each category of such identical fittings.

 
 
Home | Directors of Employement and Training | Labour Commissioner | Industrial Labour Court | Rural Labour Commissioner | Mahatma Gandhi Labour Institute | Gujarat Labour Welfare Board | Rural Labour Welfare Board | Ahmedabad Cloth Merchant Board

Conceptualised By : SilverTouch Computers Pvt. Ltd
Boilerwing Phone: +91-079-2685206
Labour & Employment Department All Right Reserved.  Terms of use | Privacy statement | Accessibility