a.
Package Boiler
Submit following Original documents pertaining
to the Boiler intended for registration to the concerned
Divisional Inspector.
i.
Form-II, Form-III and Form-IVA
ii.
Form-IIIC of all mountings and fittings
iii.
Boiler drawings in original
iv.
Form-IIIA of feed pipe
v.
Registration fee paid in challan
The registration of the Boiler will be done within
30 days or shorter period as may be prescribed from the
date of the receipt for examination of the boiler giving
not less than 10 days notice of the date fixed.
After satisfactory completion
of open inspection and hydraulic test provisional order
will be issued pending steam test.
b.
Water tube Boiler
- Obtain permission to erect the Boiler through an authorised
Boiler repairer from the Chief Inspector of Boilers.
- Submit following Original documents pertaining to
the Boiler intended for
- Registration to the concerned divisional Inspector.
i.
Form-II, Form-III, and Form-IVA
ii.
Form-IIIC of all mounting s and fittings
iii.
Form-IIIC of all mountings and fittings
iv.
Boiler Drawings in original
v.
Form-IIIA of feed pipe
vi.
Registration fee paid in challan
- Offer the Boiler for carrying out stage inspection
to the concerned divisional inspector and obtain his clearance
at every stage
PROCEDURES FOR REGISTRATIONS OF STEAM
LINE
a.
Obtain approval of the proposed steam line drawing
from the Chief Inspector of Boilers by submitting following
documents.
i.
Steam line drawing in triplicate showing clearly
welding details, materials specifications, working pressure
of boilers and feed pipeline and registration Number of
Boilers
ii.
Steam line drawing scrutiny fee paid
in challan
( Fee is Rupees 30/- for every 30 meters or part thereof)
iii.
Mention the authorised boiler repairer through whom
you are getting the same erected
b.
After obtaining approval of proposed steam line drawing
from the Chief Inspector of Boilers make application
for registration of proposed steam line with the divisional
inspector by submitting the following original documents
i.
steam line certificates in Form-IIIA
ii.
Mounting And fittings certificates in Form-IIIC
iii.
Welders certificate
iv.
Registration fee paid in challan.
c. Offer steam pipe and fittings for
material inspection and obtain clearance for erection from
the inspector of boilers.
d.
Offer the weld set up and weld edge preparation for inspection
and obtain clearance for erection from the inspector of
boilers.
e.
Subject the weld joint joints for radiographic
examination if needed
f.
Subject the erected steam line for hydraulic
test to the inspector of boiler
g.
Submit revised steam line drawing incorporating any
deviations caused during the erection due site
condition for approval to the Chief Inspector of boiler
through inspector of Boiler drawing scrutiny fee.

ANNUAL INSPECTION OF BOILERS
ECONOMISERS AND STEAM LINES
a.
Make application to the Divisional Inspector and
Inspection fee paid in challen.
The
inspection of the Boiler, Economiser and steam line will
be done within 30 days or shorter period as may be prescribed
from the date of the receipt for examination of the Boiler
giving not less than 10 days notice of the date fixed.
After satisfactory completion of open inspection and hydraulic
test certificate for the use of Boiler, Economiser will
be issued within 48 hours of making such examination.
REPAIRS
TO
BOILER ECONOMISER AND STEAM LINE.
a.
The Inspector of Boiler after making examination
of the Boiler, Economiser and Steam line will suggest any
structural alteration. Addition or renewal will intimate
the owner within 48 hours of making the examination.
b.
After receiving the suggestions from the Inspector
of Boilers for carrying out needful repairs, make
the boilers, Economisers and steam line serviceable, the
owner shall make application to the Chief Inspector of Boilers
seeking permission to carryout the repairs mentioning the
authorised Boiler repairer name through whom he is getting
the same repaired.
c.
After obtaining approval from the Chief Inspector
of Boilers the owner should offer the Boiler Economiser
and steam line for which repairs are being carried out for
inspection to the inspector of Boilers and obtain his clearance.
d.
After satisfactory completion of open inspection
and hydraulic test, after repairs. Certificates for
the use of Boilers and Economiser will be issued within
48 hours of making examination.
PERSONS TO BE INCHARGE OF BOILERS:
A certificate of Second class shall qualify the boiler
thereof to be incharge of a single boiler of any kind, the
heating surface of which does not exceed 140 sq. Mt.
a second class boiler attendant may , however, attendant
to a battery of boilers ( not consisting of more than three
connected boilers and not exceeding 140 sq.
Mt. in aggregate of total heating surface)
provided he is assisted by the number of firemen considered
necessary by the Chief Inspector of Boilers.
A certificate of first class shall qualify the older
thereof to be incharge of a single boiler
of any kind or capacity or two or more boilers
in a battery or of so many separate individual
boilers , the total heating surface of which does
not exceed 700 sq. Mts. A Person in charge of
boiler shall be deemed to be in direct & immediate attendence
and charge of the same when he is within 46 meters of such
boiler.
PROCEDURES FOR APPEARING FIRST CLASS AND SECOND CLASS BOILER ATTENDANT EXAMINATION;
a.
Requirement to appear for Second class examination
1.
Age - shall not be less than 20 years
2.
Experience - Has served for not less than 3
years as an engine fitter where boiler and engines
are repaired or made and worked under steam. I year
at least of which he should have worked as an
assistant firemen, or
3.
Has served for not less than 3 years in the
capacity of a fireman or an assistant firemen
on a steam boiler or a combined steam engine
and boiler or
4.
Produces from the head of an industrial or
technical institution a certificate stating that
he has completed a three years course of training,
one year of which must have been as an apprentice
in a steam power plant of a mill or factory or an
engineering workshop for the maintenance of
boilers.
b.
Requirement to appear for first class examination:
1.
Age - shall not be less than 21 years
2.
Experience - Has served for not less than two
years as a boiler attendant with second class certificate
of competency in sole of working charge of boiler
whose rated heating surface is not less than
46.0 sq. Mt. or
3.
Produces from the head of an industrial
or technical institution a certificate stating that he has
completed a three years course of training one of
which must have been as on apprentice in a steam power
plant of a mill or factory or an engineering workshop
where engines and boilers or repaired or made and in addition
as served for not less than one year in sole working
charge of a boiler not less than 46.0 of heating surface
with a second class boiler attendants certificate.
c.
Procedures for making application for first class
and second class examination
I.
FIRST CLASS;
1.
Application shall made in Form-A duly attested by
the Gazetted officer
2.
Service certificate in original with copy
3.
Character certificate issued by employer in original
with a copy.
4.
Two copies of recent bust photographs
5.
Fee of Rs.40 paid in challan
II.
SECOND CLASS
1.
Application shall be made in a Form -A duly attested
by a Gazetted officer.
2.
Service certificate in original with a copy
3.
Character certificate issued by employer in
original with copy
4.
Two copies of recent bust photographs
5.
Fee of Rs.30 paid in challan.
BOILER
PROFICIENCY ENGINEER EXAMINATION:
The qualified Boiler Operation Engineers are required
to maintain a boiler or battery of boilers having a total
heating surface area of more then 700 m2.The requirements
are:
| |
First class Boiler proficiency engineer |
Second class
Boiler proficiency engineer |
| age |
23 years |
21 years |
| educational qualification |
should have completed apprentice engineers
course in a recognised workshop engaged in making
or repairing of Boilers and Accessories OR should possess
a degree in mechanical or electrical engg., or possess
a diploma recognised by the Institute of Engineers.
|
should have completed apprentice engineers
course in a recognised workshop engaged in making
or repairing of Boilers and Accessories OR should possess
a degree in mechanical or electrical engg., or possess
a diploma recognised by the Institute of Engineers.
|
|
Experience |
should have served not less than 2 years as
Second class Boiler proficiencey Engineer + one year
experience as engineer in steam plant.
|
Engineer/Asst. Engineer in running and maintenance
of battery of boilers not less than two in number and
each boiler not having less than 46 m2 heating surface.
|
|
Method of examination |
Written examination consists of one paper in
Mathematics, applied mechanics, heat engines in each
subject and one paper of drawing followed by oral examination.
|
Written examination consists of one paper in
Mathematics, applied mechanics, heat engines in each
subject and followed by oral examination. |
| Mode of application |
Prescribed application duly filled in
- Form A attested by gazetted officer
- Service certificate in original along with a copy
- Educational Qualification
certificate in original with copy
- Character original certificate from the employer
with copy
- Two recent passport size bust photographs
- Rs.80 paid in challan for first class & Rs.
50 for second class
|
Contact person for further details
: Ex-officio chairman or the Ex- officio secretory to the
board of examiners.
REGISTERS TO BE MAINTAINED
Register in Form A of all boilers regiestered
in the state or the regiestry of which has been transfered
from another state.
Registration book and Memorandum of Inspection
book of all Boilers in Form no.I;
Register of appeals
Register of accidents
Register of registration and inspection fees
recieved.
|