Labour Wing Factory Wing Boiler Wing Labour Commissioner Home Labour and Employment Department Labour Commissioner

 

 

 

 


a.     Package Boiler 

Submit following Original documents pertaining to the Boiler intended for registration to the concerned Divisional Inspector. 

i.                    Form-II, Form-III and Form-IVA 

ii.                  Form-IIIC of all mountings and fittings 

iii.                Boiler drawings   in original 

iv.                Form-IIIA  of  feed pipe 

v.                  Registration fee paid in challan 

The registration of the Boiler will be done within 30 days or shorter period as may be prescribed from the date of the receipt for examination of the boiler giving not less than 10 days notice of the date fixed. 

      After satisfactory completion of open inspection and hydraulic test provisional order will be issued pending steam test. 

b.     Water tube  Boiler 

  • Obtain permission to erect the Boiler through an authorised Boiler repairer from the Chief Inspector of Boilers.
  • Submit following Original documents pertaining to the Boiler  intended for 
  • Registration to the concerned divisional Inspector.  

i.                   Form-II, Form-III, and Form-IVA  

ii.                 Form-IIIC of all mounting s and fittings 

iii.               Form-IIIC of all mountings and fittings 

iv.               Boiler Drawings in original  

v.                 Form-IIIA of feed pipe  

vi.               Registration fee paid in challan  

  • Offer the Boiler for carrying out  stage inspection  to the concerned divisional inspector and obtain his clearance at every stage

PROCEDURES FOR REGISTRATIONS OF STEAM LINE 

a.      Obtain approval of the proposed steam line drawing from the Chief Inspector of Boilers by submitting following documents. 

i.                    Steam line drawing in triplicate showing clearly welding details, materials specifications, working pressure of boilers and feed pipeline and registration Number of Boilers 

ii.                  Steam line drawing   scrutiny fee paid in challan
( Fee is Rupees 30/- for every 30 meters or part thereof)

iii.                Mention the authorised boiler repairer through whom you are getting the same erected

b.     After obtaining approval of proposed steam line drawing from the Chief Inspector of Boilers  make application for registration  of proposed steam line with the divisional inspector by submitting the following original documents

i.                    steam line certificates in Form-IIIA   

ii.                  Mounting And fittings certificates in Form-IIIC  

iii.                Welders certificate    

iv.                Registration fee paid in challan. 

 c.   Offer steam pipe and fittings for material inspection and obtain clearance for erection from the inspector of boilers. 

         d.  Offer the weld set up and weld edge preparation for inspection and obtain clearance for erection from the inspector of boilers.  

       e.    Subject  the weld joint joints for radiographic examination  if needed   

       f.      Subject the erected steam line  for hydraulic  test to the inspector of boiler

      g.     Submit revised steam line drawing incorporating any deviations caused during the erection due site 
           condition for approval to the Chief Inspector of boiler through inspector of Boiler drawing scrutiny fee.

 

 

 

 

ANNUAL INSPECTION OF BOILERS ECONOMISERS AND STEAM LINES

   a.      Make application to the Divisional Inspector and Inspection fee paid in challen. 

         The inspection of the Boiler, Economiser and steam line will be done within 30 days or shorter period as may be prescribed from the date of the receipt for examination of the Boiler giving not less than 10 days notice of the date fixed. 

        After satisfactory completion of open inspection and hydraulic test certificate for the use of Boiler, Economiser will be issued within 48 hours of making such examination.


 

REPAIRS TO BOILER ECONOMISER AND STEAM LINE.  

a.      The Inspector of Boiler after making examination of the Boiler, Economiser and Steam line will suggest any structural alteration. Addition or renewal will intimate the owner within 48 hours of making the examination.

b.      After receiving the suggestions from the Inspector of Boilers  for carrying out needful repairs, make the boilers, Economisers and steam line serviceable, the owner shall make application to the Chief Inspector of Boilers seeking permission to carryout the repairs mentioning the authorised Boiler repairer name through whom he is getting the same repaired.

c.      After obtaining approval from the Chief Inspector of Boilers the owner should offer the Boiler Economiser and steam line for which repairs are being carried out for inspection to the inspector of Boilers and obtain his clearance.

d.    After satisfactory completion of open inspection and hydraulic test, after repairs.  Certificates for the use of Boilers and Economiser will be issued within  48 hours of making examination.

PERSONS TO BE INCHARGE OF BOILERS:  

A certificate of Second class shall qualify the boiler thereof to be incharge of a single boiler of any kind, the heating surface of which does not exceed 140 sq. Mt.  a second class boiler attendant may , however, attendant to a battery of boilers ( not consisting of more than three connected boilers  and not exceeding  140 sq. Mt. in aggregate  of total heating  surface)   provided he is assisted by the number of  firemen considered necessary by the Chief Inspector of Boilers.

A certificate of first class shall qualify the older thereof to be  incharge  of a single boiler  of any kind or capacity or two  or more boilers  in a battery  or  of so many separate individual boilers ,  the total heating surface of which does not  exceed  700 sq. Mts. A Person in charge of boiler shall be deemed to be in direct & immediate attendence and charge of the same when he is within 46 meters of such boiler.  

 

 

PROCEDURES FOR APPEARING FIRST CLASS AND SECOND CLASS BOILER ATTENDANT EXAMINATION;  

a.       Requirement to appear for Second class examination

1.     Age - shall not be less than 20 years

2.     Experience - Has served for not less than  3 years as an engine fitter where boiler and engines  are repaired or made and worked under steam.  I year at least  of which  he should have worked as an assistant firemen, or

3.     Has served for not less than  3 years in the capacity of a  fireman or  an assistant firemen  on a steam  boiler  or a combined steam engine and boiler  or

4.     Produces from the  head of an industrial or technical institution a certificate stating that   he has completed  a three  years course of training,  one year of which  must have been as an  apprentice  in a steam power plant  of a mill or factory or an engineering  workshop for the  maintenance of boilers. 

b.       Requirement to appear for first class examination: 

1.     Age - shall not be less than 21 years  

2.     Experience -  Has served for not less than two years as a boiler attendant  with second class certificate of competency  in sole of working  charge of boiler whose rated  heating surface  is not less than  46.0  sq. Mt. or

3.       Produces from the head of an industrial or technical institution a certificate stating that he has completed a three years course of training  one of which  must have been as on apprentice in a steam power plant  of a mill or factory or an engineering workshop where engines and boilers or repaired or made and in addition as served  for not less than one year in sole working charge of a boiler not less than 46.0 of heating surface with a second class boiler attendants certificate.

c.        Procedures for making application for first class and second class examination

  I.                  FIRST CLASS;  

1.    Application shall made in Form-A duly attested by the Gazetted officer  

2.    Service certificate in original with copy 

3.    Character certificate issued by employer in original with a copy. 

4.    Two copies of recent bust photographs 

5.    Fee of Rs.40 paid in challan   

II.               SECOND CLASS 

1.    Application shall be made in a Form -A duly attested by a Gazetted officer. 

2.    Service certificate in original  with a copy  

3.    Character certificate issued by  employer in original with copy 

4.    Two copies of recent bust photographs 

5.     Fee of Rs.30 paid in challan.   

BOILER PROFICIENCY ENGINEER EXAMINATION:

The qualified Boiler Operation Engineers are required to maintain a boiler or battery of boilers having a total heating surface area of more then 700 m2.The requirements are:

  First class Boiler proficiency engineer Second class Boiler proficiency engineer
 age 23 years 21 years
educational qualification should have completed  apprentice engineers
course in a recognised workshop engaged in making or repairing of Boilers and Accessories OR should possess a degree in mechanical or electrical engg., or possess a  diploma recognised by the Institute of Engineers.
should have completed  apprentice engineers
course in a recognised workshop engaged in making or repairing of Boilers and Accessories OR should possess a degree in mechanical or electrical engg., or possess a  diploma recognised by the Institute of Engineers.
Experience  should have served  not less than 2 years as
Second class Boiler proficiencey Engineer + one year experience as engineer in steam plant.
Engineer/Asst. Engineer in running  and maintenance of battery of boilers not less than two in number and each boiler not having less than 46 m2 heating surface.
Method of examination Written examination consists of one paper in
Mathematics, applied mechanics, heat engines in each subject and one paper of drawing followed by oral examination.
Written examination consists of one paper in
Mathematics, applied mechanics, heat engines in each subject and followed by oral examination.
Mode of application

Prescribed application duly filled in

  1. Form A attested by gazetted officer
  2. Service certificate in original  along with a copy
  3. Educational Qualification certificate in original with copy
  4. Character original certificate from the employer with copy
  5. Two recent passport size bust photographs
  6. Rs.80 paid in challan for first class & Rs. 50 for second class 

Contact person for further details : Ex-officio chairman or the Ex- officio secretory to the board of examiners.

REGISTERS TO BE MAINTAINED 

      Register in Form A of all boilers regiestered in the state or the regiestry of which has been transfered from another state.

      Registration book and Memorandum of Inspection book of all Boilers in Form no.I;

      Register of appeals

      Register of accidents

      Register of registration and inspection fees recieved.